Rail-Served Industry & Ports

What to expect, from the first call to the first claim.

The companion to Exposure Read 27, The First Car: What are we agreeing to when we ship our first car?

Each rule cited here was read in its current published text on 15 NOV 2026: the regulations at the eCFR (current to 12 NOV 2026), the statutes in the United States Code, 2024 edition, at govinfo. The law changes after that date; read the current text before relying on any of it.

How service starts

Your plant has one serving carrier, the railroad whose track reaches your switch. Other railroads may haul your traffic between origin and destination, and they reach your door through it. Start by asking it, in writing, for its rates and service terms. A railroad must give them to anyone who asks, and before it raises a common carrier rate or changes a service term it must give 20 days’ written notice to anyone who asked for them, or arranged a shipment under them, in the previous 12 months (49 U.S.C. 11101(b) and (c)).

Ask in the same letter for the service window at your plant, the cut-off for requesting a spot or a pull inside it, and the system the carrier uses to take those requests. The Board defines all three for the Class I railroads, which report each week the share of requested spots and pulls they performed inside the planned window. They report it by division and for the whole system, and not by facility (49 CFR 1251.1 and 1251.2(b)). The only count of your own door is the one you keep.

The car

Cars come from two places: the railroad’s own fleet, ordered through its car-ordering system, and private cars, owned or leased by the shipper or a lessor. Boxcars carry packaged and palletized freight. Covered hoppers carry grain, plastic pellets, cement and sand. Open-top hoppers and gondolas carry aggregate, scrap and steel. Flatcars and centerbeam cars carry lumber, structural steel and heavy machinery. Tank cars carry liquids and gases, many of them hazardous. These pairings are industry practice rather than rule, and we could not tie them to a single published source. Our reading is that they are a starting point, and that the receiver’s unloading equipment settles any doubt. Matching the car to your lading is part of our paid work; write to us. The commodity, the loading method and the receiver’s unloading equipment choose the car between them, and the receiver’s equipment is the one a new shipper forgets to ask about.

Order against a forecast. An empty you ordered and cannot load is a car standing at your door on the railroad’s clock.

Loading and weighing

The shipper loads the car and answers for how it was loaded. The rules for securing the load are in the next section.

Every car is stenciled with its light weight and its load limit, and the two add up to the gross weight the car is allowed to put on the rail. The load limit is the most lading the car may carry. We could not confirm that sum in a primary source we could open, because AAR’s stenciling and interchange rules sit behind its member login. Our reading follows the scale ticket, which records a car’s gross weight as its tare plus its net (NS 8002-A, Item 1030): the light weight is the tare, and the load limit is the most net the car may carry, so the two add up to the car’s gross rail load. If your loads run close to the limit, write to us; working it out for your cars is part of our paid work.

Weigh what you load. The carrier’s tariff says how weights are taken: scales whose weights are used for billing must conform to the AAR Scale Handbook, and a shipper’s own weights are accepted only under a weight agreement the carrier supervises. The handbook is now issued as the AREMA Scale Handbook. We could not confirm that every carrier accepts the current AREMA edition where its tariff names the AAR handbook; our reading is that it does where the tariff adds “or any reissues thereof”, as one Class I tariff does (NS 8002-A, Item 1000). Confirming it with your carrier is part of our paid work. The overloaded car costs far more than the freight. Under one Class I accessorial tariff in force on 15 NOV 2026, Norfolk Southern’s NS 8002-A, a car over its load limit, or over the track’s weight limit anywhere on its route, may be stopped en route for the shipper to unload the excess at its own expense. The charge is $4,000 for a car of non-hazardous freight and $10,000 for a hazardous materials car, doubled after the shipper’s third overloaded car in a calendar year. Read your own carrier’s version of that item before the first load.

Securing the load

The railroad moves the car. The shipper loads it, and answers for how. Under the Uniform Freight Classification, shippers must comply with the carrier’s rules for safe loading and the protection of its equipment (UFC 6000, Rule 27, Section 3), and a carrier’s accessorial tariff can make those rules the shipper’s duty by name (NS 8002-A, Item 5040, as one carrier’s example). The rules are written by the Association of American Railroads and tested before they are published. A load that shifts, tips or leans on a door in transit is still the shipper’s load, wherever the car is stopped. Rule numbers below are those of AAR Circular 42, the general rules for closed cars. We could not confirm them against the current edition, 42-P of March 2023, which sits behind an AAR login; the numbers and wording here were read in the 42-N text of October 2019. Our reading is that the general duties cited carry into 42-P, which AAR lists under the same title, but that the strapping specifications and the center-of-gravity rule are the places to read 42-P itself before you load. We could not confirm the current edition of the Uniform Freight Classification either; Rule 27 was read as Circular 42-N reprints it. Our reading is that its loading duties still stand, since one carrier’s 2026 tariff still sends shippers to Rule 27 (NS 8002-A, Item 6210). Checking your loading methods against the current editions is part of our paid work; write to us.

Which book. Open-top cars, meaning flatcars, gondolas and centerbeams, are loaded to the AAR Open Top Loading Rules. Section 1 holds the general rules for every commodity in interchange, the responsibilities of each party, the minimum requirements and AAR’s lists of approved tie-down and securement materials; Sections 2, 3 and 5 carry approved loading figures for steel and pipe, for machinery and vehicles, and for forest products. Boxcars are loaded to AAR Circular 42-P of March 2023, whose general rules take precedence over the commodity methods, and to the part of the AAR Closed Car Loading Guide written for your commodity: Part 1 sets minimum loading standards for boxcars in general service, and later parts cover roll paper, plywood, lumber, brick, packaged food, bagged and baled goods and metals. A load that no figure or method covers needs the carrier’s approval, in advance and in writing (NS 8002-A, Item 5040). We confirmed that in one carrier’s tariff and could not confirm it for others. Our reading is that any carrier will want the same, since the shipper answers for the load under Rule 27; ask yours before the car is ordered. Drafting that request with you is part of our paid work.

Before anything goes in. Inspect the car at the loading point: sound roof, sides, floor and end walls, and doors that work and fit. Any exception is cause to reject it (Rule 1.A). Reject a car that still holds the last shipper’s dunnage, blocking or strapping; one carrier assumes a car you load was clean (NS 8002-A, Item 6210). Never open or close a door with a forklift; if a door will not move, call the serving railroad, and see that every door closes and locks (Rule 9).

Weight, and where it sits. The load may not exceed the load limit stenciled on the car or listed in UMLER, the industry’s equipment register; where the two differ, use the lower and report the difference to the serving railroad. No more than half the load limit may sit on either truck (Rule 2). The weight is spread evenly lengthwise, with limits on how much of the load limit a short load may concentrate between the trucks or place beyond either truck (Rule 3), and about equally side to side, with secured ballast where the load cannot be balanced (Rule 4.A, 4.B). Tall and top-heavy loads raise the combined center of gravity of car and load, which AAR limits; for tall loads in high-cube boxcars the shipper must calculate it (Rule 7).

Blocking, bracing and dunnage. Blocking stops the load moving; bracing holds it against the car. The lumber must be sound and without defects that weaken it or prevent proper nailing, and machines with a high center of gravity or a narrow base must be secured against tipping (Rule 5.B, 5.C). In a boxcar, lading must be secured against moving toward the sides once the open space across the car adds up to more than 18 inches, or 6 inches for primary metals (Rule 4.C). Air bags used to fill voids must be on AAR’s Pneumatic Dunnage Product Verification List, which re-verifies each product every three years.

Tie-downs and strapping. Steel bands, polyester strapping, web assemblies and chain binders are approved product by product, and AAR publishes the approved lists by table with the Open Top Loading Rules. Use the strapping, the count and the tension the figure or method calls for. Check the table before you buy the strap.

The doorway and the walls. Where lading could fall or roll out of a doorway or come against a sliding or plug door, the opening is protected with doorway protection, steel straps or other material of sufficient strength; lumber wedged between the door posts is not doorway protection (Rule 6). In closed cars with doors other than plug doors, freight is loaded so it cannot touch the doors in transit (UFC 6000, Rule 27, Section 3), and every load is placed so it can be unloaded from either side (Rule 5.A).

When the load moves. No lengthwise shift is permitted in a closed car unless the load is secured as a floating unit, with every prescribed securement, doorway protection and, where the method calls for them, retardation aids (Rule 3.G). A carrier may inspect, weigh and reject a car at origin for its load, and may stop a car en route and hold it until the shipper re-blocks, re-braces or transloads the lading at its own expense. Under NS 8002-A, Item 5040, that is $4,000 for each improperly loaded car, doubled after the shipper’s third in a calendar year, with possible embargo and $250 a day in demurrage and storage from the day the carrier says the car is ready for adjustment. A car with a mechanical defect moves only for repair, under a "bad order" tag, and an empty car tagged that way may not be placed for loading (49 CFR 215.9). The federal freight car standards set the car’s condition; how it is loaded is set by AAR’s rules and the carrier’s tariff.

Hazardous materials in the car. Each package is loaded so it cannot fall or slide, and safeguarded so other freight cannot fall onto or slide into it; where other freight cannot do that, it is blocked and braced (49 CFR 174.55(a)). Packages marked for orientation stay upright (174.55(b)), and a door may not be used to secure the load unless it meets AAR’s design strength specification and the load is within it (174.55(c)). Units on flatcars are secured so they cannot permanently change position (174.61(a)); bulk packagings inside closed equipment are restrained from sliding or touching the walls and doors (174.63(b)); explosives carry loading rules of their own (174.101). The carrier inspects every hazardous materials car at acceptance and may not move it until a deficiency is corrected (174.9(a), (c)).

When it arrives. The receiver removes all non-railroad dunnage, blocking, bracing and strapping and returns any railroad-owned securement devices to the same car (UFC 6000, Rule 27, Section 5 and Note 2). One carrier bills $1,000 a car for material left behind (NS 8002-A, Item 6210). The car goes back the way it came, or the next shipper rejects it.

Demurrage and storage

Demurrage is the charge for holding a railroad’s car past the time its tariff allows for loading or unloading. It compensates the carrier and penalizes undue detention (49 CFR 1333.1). Where no contract covers it, the serving carrier’s demurrage tariff governs (1333.2), and you can be held liable under it only if the carrier gave you actual notice of that tariff, in writing or electronically, before it placed the cars (1333.3(a)). Ask for that notice and keep it.

The statute requires a railroad to set its demurrage charges and rules to serve car use, car distribution and an adequate car supply (49 U.S.C. 10746). The Board’s 2020 policy statement holds that charging demurrage for delay the carrier caused is unreasonable (EP 757, 85 FR 26866); it is guidance for negotiation and for a case before the Board, not a binding rule. A Class I invoice must show, car by car, the original estimated arrival, actual and constructive placement, the notice of constructive placement, any order-in, and the release, with the date and time of each (1333.4), and the carrier must give you that data in machine-readable form (1333.5). If a warehouse or transload receives cars for you under an agreement that you pay the demurrage, a joint notice to the Class I carrier moves the billing to you, starting no earlier than 20 days after the notice (1333.3(b)).

Private cars held on the railroad’s track are billed under its tariff items for storage and holding. We could not confirm that as a rule for every carrier. Our reading rests on one Class I tariff, which bills a car held at a customer’s order $220 a day from arrival until release (NS 8002-A, Item 2040) and sends holding and storage charges on private equipment at repair shops to a separate tariff (Item 3000). Expect a charge, a rate and a start time in your own carrier’s tariff, and find them before a private car sits. Finding them is part of our paid work; write to us. Reconcile every invoice against your own log of placements and releases. Your log is what the invoice is checked against.

Hazardous materials

If you offer a hazardous material, the regulations make you the first link in the chain. You class and describe the material and confirm that the packaging or tank car is authorized for it (49 CFR 173.22). You prepare the shipping paper (172.200 and 172.201), give an emergency response telephone number that is monitored the whole time the material is in transportation (172.604), and supply the placards (Part 172, Subpart F). Before you offer a tank car, loaded or holding residue, you examine it and determine that it is in proper condition and safe for transportation (173.31(d)). The railroad may not accept the car without a conforming shipping paper (174.24).

Everybody at your plant whose work directly affects the safety of the shipment is a hazmat employee under the rules (49 CFR 171.8), trained for his function and retrained at least once every three years, with a record kept (172.704). Unloading tank cars at a transload carries its own duties: hand brakes set, wheels blocked, the track secured against other equipment and STOP signs posted (174.67). A shipper that offers a quantity that requires placarding must, with narrow exceptions, register with the Pipeline and Hazardous Materials Safety Administration before it offers the material (49 CFR 107.601), and a shipper of rail security-sensitive materials inspects the car before loading, keeps it in a rail secure area and documents the hand-off to the railroad (49 CFR 1580.205).

Your track and its clearances

If cars come through your gate, the track past a point named in your industry track, sidetrack or private track agreement is yours. That agreement is a contract with the serving carrier: who maintains what, who answers for what happens on it, which way the indemnity runs and the clearances you must hold. Track the serving railroad operates over falls under the federal track safety standards even behind your fence (49 CFR 213.3(b)(1)). Clearances, the room kept between the track and anything beside or above it, are set by the agreement and by the carrier’s industry track standards, and in some states by statute or commission rule. We could not confirm which states set them, or at what distances; no state statute was checked. Our reading is that where a state sets a clearance, an agreement cannot lawfully set a smaller one, so the larger of the two is the figure to build to. Write to us with your state and your agreement; reading the one against the other is part of our paid work. Measure them before you build anything near the track, and again after. The full read on this is our Door Who answers for the track inside our fence?.

The bill of lading

The bill of lading is the receipt and the contract of carriage in one document. Rail carriers must use the uniform straight or order bill of lading the Board prescribes, on paper or electronically (49 CFR 1035.1), and the electronic version may follow the national standard for electronic data interchange (1035.2), which in rail is the X12 404 transaction. Its first lines receive the property "subject to the classifications and tariffs in effect on the date of this Bill of Lading" (Part 1035, App. A). The date on the paper picks the tariff.

Your shipping instructions name the shipper, the consignee, the route, the car, the commodity and its code, and the weight, and for a hazardous material its full description. A wrong commodity code bills the wrong rate. A wrong hazardous materials description is a violation. The carrier must issue a receipt or bill of lading, and failing to issue one does not reduce its liability (49 U.S.C. 11706(a)). The arrival time a Class I railroad reports against starts when you release the car "with all necessary and customary documentation" (49 CFR 1251.1). Incomplete paper means no clock.

When something arrives damaged

Under the Carmack provision, the receiving carrier, the delivering carrier and the carrier on whose line it happened are liable for the actual loss or injury to the property (49 U.S.C. 11706(a)). The railroad may not give you less than nine months to file a claim, or less than two years to sue, the two years running from its written notice that it has disallowed the claim (11706(e)). A released rate can limit the carrier’s liability to a value you declare in writing or agree to in writing (11706(c)(3)). Know whether your rate is one.

A claim is a written or electronic communication that identifies the shipment, asserts the carrier’s liability and demands a specified or determinable amount of money (49 CFR 1005.2(b)). A bad order report, or a damage notation on a delivery receipt, is not a claim standing alone (1005.2(c)). The carrier must acknowledge your claim within 30 days, and pay it, decline it or make a firm compromise offer within 120 (1005.3 and 1005.5). Record the damage in images and in writing before the car is unloaded, and keep the loading record that shows how it left you. Under a contract, the contract sets the terms. Under an exemption, ask in writing for the terms consistent with Carmack.

Getting the most from the railroad

The railroad pays the shipper who runs his plant to its clock. Put one person in charge of the railroad at your plant and give the carrier that name. Order cars against a forecast. Load to the AAR figure or method, secure every load to the rule, weigh every car and release inside the window. Keep your own log of every spot, pull, release and invoice, in the fields the Board requires a Class I invoice to carry, so every invoice can be checked line by line. Ask the carrier’s customer and local operating people to walk the track and the dock with you before the first car, not after the first dispute. Price a contract once your volume can carry one, and read what it takes away along with what it gives. A shipper who keeps his side of the record has standing when the railroad misses on its side.

Back to the seven

These are the rules. The seven questions that test whether your plant is ready for them are on the Door itself, What are we agreeing to when we ship our first car?. Run them, and write and say which one you could not answer: solutions@steelwheels.co · 928.605.7984.

Where the Wheels meet the Steel — Point of Contact

This page is general information about railroad practice and the rules it cites, as they read on the date shown. It is not legal, engineering or financial advice, it does not replace counsel, a carrier’s tariff or an inspection of your property, and reading it does not engage SteelWheels.Co.