Did the gangs make plan last night? If they didn’t, why not, and what does it do to the program?

Every roadmaster and division engineer carries that question into the morning call. RailHead puts the answer on one screen.

Request a demo

The demo runs on Prairie Star Division, a fictitious division. Access is by password, issued on request.

The way it goes now

The night report gets written twice

The window closes, the machines tie down, and the foreman still owes the night. Ties in against plan. Ramp-up. Track time asked for and track time given. Authorities, work limits, overtime, and the reason the count came up short. It leaves the gang as a text, a phone call, a photo of a notebook page or a spreadsheet, and somebody up the line types it again before the division sees it.

By the time the capital program has a number, it is a day old and has been through two pairs of hands.

What RailHead does

Fill the Board once. It writes the night report.

RailHead is the nightly command tool for mechanized maintenance-of-way production gangs, tie, surfacing and yard tie, and for the capital program above them. The foreman fills the Board once a shift. The division sees every gang on one screen.

It installs on a phone from the browser and runs full screen, dark, for night work.

From the demo

Prairie Star Division

RailHead opening screen, Division view: Prairie Star Division roll-up with four gangs reporting and each gang's percent of plan, above the tab bar for Division, Board, Report, Trends, History and Library
Division. Every gang on one screen.
RailHead Board for tie gang TG-11 on the Saltgrass Sub, showing ties per window hour, ramp-up minutes and peak per hour against goal
Board. The three numbers against goal.
RailHead night report for TG-11, with production against plan and the reason for the shortfall
Report. Written from the Board.
RailHead Division report for Prairie Star Division, compiled from four gang reports, with each gang's planned and actual production
Division report. Compiled from the gang reports.
RailHead Trends: daily tie production for TG-11 over the season against a plan of 1,920 ties
Trends. Week, month, quarter, season.
RailHead History: the season's reports by date and gang, with a download to spreadsheet button
History. By date and gang, to CSV.
RailHead Gang comms: posts from the foreman and dispatcher about an authority and switch positions
Gang comms. Posted to the gang.
RailHead Reference library: searchable handbook, FRA 213 and MOW rules entries, filtered by source
Library. Searchable, on the device.

Prairie Star Division is fictitious. Every gang, subdivision, yard, name and figure in the demo is invented for the demo.

Where it stands

Demo by request. Paid pilots with railroads.

RailHead is available as a demo by request, and for paid pilots with railroads. Work is saved on the device.

Ask, and we’ll arrange access. Entries stay in the browser on the device they were made on, through a reload or a restart. A pilot is scoped with the railroad, gang by gang.

Who is behind it

Career railroaders

RailHead is a SteelWheels.Co product, built by a firm of career railroaders for the people who run production gangs and answer for the program. The record is on the main page, under Track Record and About.

Pilot RailHead on your territory

Start with the gangs: how many, what kind, and where the night report goes now.

RailHead Service Design Team
928.605.7984 · railhead@steelwheels.co
Request a demo